AW Maritime were engaged for the detailed design and construction drawings of the Toordin Jetty Upgrade Project. The design included the demolition of the existing structure, sleeving and grouting of existing piles, reconstruction of deck substructure, installation of handrail, fenders, mooring cleats and lighting, as well as the installation of a floating pontoon and gangway. Photo courtesy of Parks Victoria.