Heavy lifting operations, supply and installation
AW Maritime completed detailed structural analysis of existing wharf structures to assess heavy lifting operations associated with the demolition of existing container cranes and supply and installation of new cranes at three sites: Port Botany; Port of Melbourne; and Port of Brisbane. Specialist engineering was required for skidding of up to 1600 tonnes cranes into position.