Middle Brighton Pier, VIC

Middle Brighton Pier, VIC

Detailed design of modular steel low landing

PW Johnson successfully completed the construction of a new lower landing at Middle Brighton Pier, designed by AW Maritime for Parks Victoria.

The design included a modular steel frame solution and careful consideration of wave loads as the structure is heavily inundated in storm events. The landing has been well received by the public and is heavily used at this popular swimming location.

Client: Parks Victoria

Subscribe To Our Newsletter