AW Maritime were engaged to assist Parks Victoria in the production of a Local Port Area Plan for Sandringham Harbour. As part of the plan, AWM prepared concept designs for a new Hampton Pier presenting two options with pontoon and low landing features. The options were presented for public feedback and comment, and a cost estimate for the construction was a new pier was also produced.
AW Maritime was also engaged to develop a technical specification detailing the removal and demolition of the existing Hampton Pier by Jackson Clement Burrows Architects (JCBA) for Parks Victoria.